conventional power generation
|
|
|
|
4Projects was selected to assist with a large power generation business units activities associated with asset development and project execution. 4Projects has been deployed across multiple projects within the business unit. 4Projects gives the Client greater control of asset option selection, technology, engineering design development, management, asset procurement activities and construction management. In accordance with their FEL Project Gate process 4Projects allows the Client to address all issues throughout the FEL process.
The selection of the 4Projects collaboration solution enables the Client as the Owner/Developer/Operator to review & disseminate information across both internal and external interfaces in an effective, timely and efficient manner. Additionally 4Projects e-Tendering application has been deployed to permit the Client to manage all tendering activities for capital equipment and services procurement on a number of projects.
Critically 4Projects use has been extended from capital projects to outage projects associated with the ongoing asset management phase.
4Projects permits the Client to have full visibility across all project activity and additionally the comfort to know that all regulatory compliance (both external and internal) issues can be addressed (e.g. such as Sarbanes Oxley and OFGEM) with the integrated audit record within 4Projects.
4Projects significantly improves the collaboration process, assists with project risk mitigation and delivers a clear direct cost saving coupled with overall business and project efficiencies.
|
 |
| Contract Information |
| Start |
Oct 07
|
| |
|
| Duration |
3 Years
|
| |
|
| Collaboration Statistics |
| Total Uploads |
22916
|
| Total Downloads |
53645
|
| Organisations |
376
|
| Users |
840
|
| Drawings / Documents |
20822
|
| Tasks |
735
|
| Photos |
1055
|
| Binders |
269
|
| Projects |
25
|
| Statistics Date |
Jan 09
|
|
 |
| In February 2007 4Projects further increased their presence in the energy supply industry by announcing a 5 year deal with E.ON UK, the U.K.'s largest integrated energy company to provide the collaborative extranet for their Holford Gas Storage Project.
In July 2005 E.ON UK, a subsidiary of E.ON, the world's largest investor-owned power and gas company, purchased Holford Gas Storage Limited from Scottish Power, a proposed underground gas storage facility located in Cheshire. Once fully developed Holford could be one of the fastest churn facilities in the UK – meaning large volumes of gas can be pumped into the National Transmission System (NTS) very quickly.
The Holford Gas Storage facility when complete will have a total capacity of 162 million cubic metres (mcm) of gas and would be made up of eight separate underground storage caverns, each measuring approximately 100m in diameter and 100m high.
With the complexity of a project like the development of the Holford Gas Storage facility, E.ON required all partners in the development to collaborate closely and chose 4Projects to deliver a secure web based solution. The solution ensured consistency in communications and easy to use technology that could be rapidly implemented and accessed by all its partners.
|
 |
|
| Contract Information |
| Start |
Feb 07
|
| Value |
£250M
|
| Duration |
5 Years
|
| |
|
| Collaboration Statistics |
| Total Uploads |
12,862
|
| Total Downloads |
23,494
|
| Organisations |
299
|
| Users |
391
|
| Documents |
13,870
|
| Statistics Date |
Jan 09
|
|
 |
|
4Projects is being used to ensure compliance with strict regulatory issues across connections to it's grid assets throughout the UK. Principal activities managed through 4Projects are the identification and request for grid connectivity, design and commercial development of the grid connection process and ensuring that transparency across a competitive framework are maintained with detailed reports against the regulatory compliance issues prevailing.
It is important that whilst the grid owner SPPS is to provide the grid connection and the power cabling between the proposed new development, site cabling within the development site is not usually undertaken by SPPS. However to ensure that commercial and technical compliance within the competitive framework dictated by OFGEM is always transparent for the main grid connection works 4Projects assists our Client in both the provision of the activity itself coupled with the unique audit capability inherent within 4Projects.
Each project controlled within the 4Projects application uses workflow to additionally automate the reviews and use a stage process for activating the work, for example:
- P.O.C (Point of Connection)
- Design Approval (Designs for the connection are laid out)
- Contracted Acceptance (The connection is created and power is activated)
- Line Working Acceptance
- Confirmation of Completion
|
 |
| Contract Information |
| Start |
Nov 02
|
| |
|
| Duration |
Ongoing
|
| |
|
| Collaboration Statistics |
| Total Uploads |
163524
|
| Total Downloads |
398880
|
| Organisations |
88
|
| Users |
1432
|
| Documents |
111690
|
| Statistics Date |
Jan 09
|
|
 |
|
|
 |
|
|
|
|
|
|
|
|
|